OFFLINE STAND BUILDING - HORIZONTAL


The Iron Derrickman® Horizontal Offline Stand Builder systems build and torque triple stands of drill pipe. Completed stands are picked up and racked by the Iron Derrickman® Racking Board Pipe Handling system, ready for presentation to well center as required. The unit also delivers single joints of range 3 Casing and range 2 drill collars to the drill floor. There is no requirement for mouseholes, winch lines, or drilling hands on the drill floor or on the racking board. The system can retrofit into most existing drilling rigs.